Case Study

Smarter Data Center Deployment

Avoiding the 9 most common mistakes in data center deployment.

Common Mistakes to Avoid in Data Center Deployment

  1. Failure to take TCO into account — Optimizing only for initial CapEx while ignoring multi-year OpEx.
  2. Poor cost-to-build estimating — Underestimating site preparation, redundancy, and utility connections.
  3. Improper design criteria — Failing to align engineering specs with real business uptime requirements.
  4. Site selection before design criteria — Committing to locations before power, fiber, and environmental metrics are verified.
  5. Space planning before design criteria — Sizing rooms before power densities and cooling methodologies are chosen.
  6. Designing into dead-end — Lack of modular scalability for high-density compute evolution.
  7. Misunderstanding PUE — Treating PUE as an absolute metric rather than an operating condition.
  8. Misunderstanding certification — Overpaying for tier certifications that do not match operational goals.
  9. Overcomplicated designs — Adding unnecessary complexity that introduces single points of human failure.
Smarter Data Center Deployment — Research Whitepaper