Case Study
Smarter Data Center Deployment
Avoiding the 9 most common mistakes in data center deployment.
Common Mistakes to Avoid in Data Center Deployment
- Failure to take TCO into account — Optimizing only for initial CapEx while ignoring multi-year OpEx.
- Poor cost-to-build estimating — Underestimating site preparation, redundancy, and utility connections.
- Improper design criteria — Failing to align engineering specs with real business uptime requirements.
- Site selection before design criteria — Committing to locations before power, fiber, and environmental metrics are verified.
- Space planning before design criteria — Sizing rooms before power densities and cooling methodologies are chosen.
- Designing into dead-end — Lack of modular scalability for high-density compute evolution.
- Misunderstanding PUE — Treating PUE as an absolute metric rather than an operating condition.
- Misunderstanding certification — Overpaying for tier certifications that do not match operational goals.
- Overcomplicated designs — Adding unnecessary complexity that introduces single points of human failure.